#Anyone Got autoloaders and unloaders for sale? Ping me and can I view it might buy need 1 asap
1 messages · Page 1 of 1 (latest)
#1267961062683050209 message
TCS LOGIC CO PRESENTS: Universal Item Unloader & Processor
Link to Video Showcasing: https://youtu.be/2p26GvWOW0c
Features
- Works with ANY item!
This system can process wood, rock, and ore, as well as allow you to unload anything easily into a drawer, or directly into a storage system!
- A material processor made for grinders & builders!
This system is fit with a forge and planker bypass system, it’s now easier than ever to only refine rocks or sand wood for certain textures! Also works as an effortless way to process your material for quick cash!
- No Clogging within material processor
Zero clogs from the processor to the truck!
- Easy to use operation panel
Easily control your system from a single control panel! Automatically included with purchase!
- Auto Distribution
All items will be split roughly into 1/3rds and distributed between 1 truck and 2 trailers automatically
Specs
Approximate Sizing: LxWxH =124x48x32 (1 truck 2 trailers)
89x48x32 (1 truck 1 trailer)
Processing Speed: 1 Item/s
Loading Speed 10 items/s
Truck Capacity: 1
Trailer Capacity: 2
Pricing
1 Truck 1 Trailer System: 550k + logic, conveyors, and machine costs
Approx total Cost: 950k (If you have literally nothing, you most likely have some drawers and alignment conveyors laying around which take most of the 400k material costs)
1 Truck 2 Trailer System: 750k + logic, conveyors, and machine costs
Approx Total Costs: 1.15M (If you have literally nothing, you most likely have some drawers and alignment conveyors laying around which take most of the 400k material costs)
B
So are you not interested?
No sorry labor price is not negotiable. I’m sure you have drawers and allignment conveyors around which make up most of the 400k material costs
yeah that’s what I meant it’s gonna cost
400k or that’s 400 out of the price
If I have materials
No labor costs and Logic costs are separate
Otherwise I could be walking in and spend 2 and a half hours making like 100 - 150k
If you looked at the showcase video you’d see it’s worth the price. 7 built and I’ve only gotten complements. It’s a great system and probably one of the most reliable you’ll get for the price
Oh
With out labor cost what are we looking at
Looks cool
Just wondering about the price I’m interested
About 300k of the 400k material costs are drawers and allignment conveyors. 8 drawers for the largest system costs 215k and the 7 allignment conveyors cost about 85ish k. If you have extra which most people do it cuts the cost of materials significantly
Alright
In the video
Which machine is it
?
The best one or the 550k?
That is the best one, a 1 truck 2 trailer system with auto distribution between them all.
Yup
Alright
How different is the other machine?
Ohhh
The 1 truck and 2 trailer is meant for a truck and 2 trailers attached?
Yea that’s the only difference in the system.
Alright I would wanna get the 550k
Can we do it tomorrow it’s late for me right now
Yea 100% it’s 12:24 am for me rn anyway lol. If you want I can send the material list over and you can prepare it when you got time, then I can just get to work.
Yeah
@paper hare it’s the same time for me aswell est time zone
I get out of school around 3:30
I might have to get a little bit of money but I’ll be quick 30 mins so around 4 I’ll ping you when I’m available
Also please send materials list
Alr awesome that works fine for me. I’ll get that sent to ya asap
Alr
LOGIC
12 T Flip Flop
3 Collider
15 Interactors
11 Buttons
2 Chat Commanders
5 Frequency’s
5 Delays
5 Number Interfaces
8 Calculators
6 NOT gates
4 Blockers
5 LCDS
4 Speakers
2 Pressure Pad
1 Elevator
2 Sustainer
CONVEYORS
10 Straight
1 Tilted
8 Borderless
7 Allignment
3 Extending
MACHINES/MISC
7 Drawers
1 Planker
2 Sanders
1 Refinery
1 Forge
Alr thanks
What's the difference between refinery and forge
Forge makes the ore more value able
And refinery makes it more value able than when you mined it
Ok
Alr
U got like a tutorial for a auto machine
Ok thanks bro
no to make an ingot you HAVE to put the ore through the refiner first then forge
Ik I told him that
See
if your gona copy a tutorial do an expensive one they don't clog up as fast, they may be difficult but its worth it sometimes
Or buy mine and I’ll make it for you 🤷
yes
Might have too
: D
Il stay in touch
I’ll ping you when I’m available
Awesome sounds good
logics is super good he makes like 200k more then me each run
and its small
Who?
Ima spend 800k on a machine to make it more easy for me
he made my lights in my storage flicker
okay I can tell you a method to make that easier for you
Make what easy
making that amount of money
by tmr?
I need 500k
so you gota do it now?
There is zero rush btw
wait so you made 1mil or spent
Just making sure lol I have no orders currently. It’s always slow in my industry around event times lol
good for you, now you don't gota use mine
Yeah lol
yes
I need your machine so I can make money quicker
Instead of me doing it manually and I can buy gifts
lol reasonable. It works amazingly for ores, I made a cheaper version for myself (I’m very cheap ngl) and even that has been able to process things great. It’s a w system ngl no glaze fr
Alrighty lol do lmk
Alr bet. Anyway we could do this trm? It’s my birthday today and I don’t exactly wanna play the game ngl. I kinda forgot abt it ngl :/
Alr that’s fine
I’ll ping. You when
Or you
Alr awesome ty. I’ll be able to do it around 3:30 -4PM est tomorrow. You can ping me or I can if you don’t
Ayyy Ty lol I appreciate it
That’s fine
Alr lol lmk
happy birthday bro 🌹😈🎂
Thank you😭 
W timing I just got home. Give me a couple mins to get situated and I’ll hop on.
Alright
Js ping me
@severe cradle im ready, user is powertaker212
I’ll join u
alr
What stuff
logic
the computer for the lights?
Gave 1 Vouch to _danlol (current: #723 - 13)
@severe cradle rep me back when u can plz
Gave 1 Vouch to kimjongunsbrother9420 (current: #34 - 163)