#V2 Hybrid Processor-300k DIY! (27 built already!) Silber's Logic Solutions!
1 messages · Page 6 of 1
i dont use google docs..
thats super cheap!

you used it wrong
or you just edited the values lol
nah nah its just that cheap

i am apart ofthe boyz squad i am vip

who the heck even are these people
and why that ski hill got no snow
idk
because its in england
AND FOR SOME REASON
WE DONT GET NO SNOW HERE
EVEN WHEN WE DO ITS LES THAN 1CM THICK
hey Silbersix, I'm able now
uhmmmm, I dont trust in you
How much does it cost to build the v2?
1m service fee for truck+3 trailer
materials overall are about 700k
not avail but ill let you know if i become avail
So 1.7?
ye, if you have none of the mats already
I'll probably go with the full v1.2 3 trailer + sellner without having to get the mats myself other than the Schematic materials
price for v1.2 is different snow
ah okay, well I alr have the truck n trailers. N industrial stuff, Would there be any way to make the command stuff buttons or switches? Because I’m on console and well Yk you can’t chat on console
yep ive changed that out before
What is le v1.2 price then
Ahh alrighty
I'm on mobile rn xd
google sheets works on mobile 
Alrighty good, do you have a spread sheet of all the requirements n stuff?
check pins

ok
i'mma legit take the entire thing aka fruit sorter, all of it
the full behemoth in v1.2 format
well, have just one problem
I think 2 modules of the v1.2 isnt working
wdym
like, the extra things that you cna add
like the fruit thing
@cloud pilot , can you say which of the modules isnt working?
to Snowstorm
Huh
Gimme a sec
Yeah auto spill cleanup and fruit sorter
Those work
The bypass hasn't been made yet but should honestly be really straight forward

i don't need the bypass or filter for rare ores
I do however advice the fruit sorter be seperate but whatever floats your boat lol
Filter doesn't exist yet
ik xd
bump (not free tonight for builds sorry yall)
Gonna save up for this 

in the mean time i have a raffle running if you wanna gamble for it
How many tickets are sold rn?
5
minumum sell is 50
otherwise im refunding
sept 31st is the draw deadline

imagine buying 5 and being that guy 
GOD
could be you 
put it in the raffle chat and chose your numbers
how much to upgrade from v1 to v2
sadly its not an upgrade but a rebuild. i can retrofit the new unloading mechanism
dam
im also willing to provide the instruction book for free for any v1 havers
i just need to be compensated for my tim ein honesty
if you want the v2 guide ill send it to you
its actually good compared to the v1 one lol
lol
can i buy one?
@cloud pilot hey, I'd like to buy the 300k blueprint package for v1.2 unloader/loader
Morning. Yes you can. Please use the spreadsheet to select your model and specifications
Can do however the old guide is uh.... Terrible to say the least. For those looking at a DIY option I recommend the v2 unless you want to struggle lol
I intend to redo the guide some day but that's not a priority for me
The v2 guide took every lesson learned from the v1.2 guide
hey good morning
well while v2 is compact, it doesn't look aesthetically pleasing for me, although it's impressive how you manage to make it on that little space
so I'm going for the v1.2 option
I think the instructions would be fine if people already did v1.2 DIY
It's been 1 success and 4 "I give up". How competent are you with Oakland's in general
Otherwise I can make an effort to improve the guide but man
That's guna take a hot minute
uh, I was able to reverse-engineer something in the oakmarket based on the materials alone
may not be a reliable basis to show how competent I am but that's the best thing I was able to do
Aight well. I'll be here for written assistance but I can't hold your hand. I'll sell it to you but buyer be warned and all that. I'll lyk when I can hop on for payment
sure if I have troubles I'll ask
I'll be sending you both guides and providing instruction on how to meld the two- the v1.2 guide includes the old unloader module but I'll basically tell you where to start and stop in the new guide and where to connect to it in the old guide
yo if u buy a v2 version i’ll build it by myself or u can build it for me ?
I offer both services. Building it yourself you buy the instruction book (93 pages step by step, think like Lego steps) and the assembly service is 1m+ you provide materials
alright thank you
For anyone looking to own one for cheap I'm also running a raffle for a fully assembled fully material supplied v2
so i need 1.7 overall right ?
Yes for assembly service (full size)
okay,i’ll tag u here when i’ll be ready
how much for just blueprint?
instruction i mean
300k
can i buy it rn?
I can hop on for payment in approx 2 hours. For like an hour window
Otherwise I don't send until payment is received
Sorry for the inconvenience
all good
@cloud pilot I dm you on discord for help
@cloud pilot u here ?
How much for this processor
And can the loading system be linear so that the trucks are lined up or does it have to be curled up like that
hmm probably something suddenly came up and made him occupied at the moment
Sorry no had a group member pull me away. I'll let you know when I'm free next.
bro all i need is a instruction please can u just give it to me i can’t wait that long cuz i really need it
calm down
if you see the quantity of items that need to build it, you would already see how much time would need to explain to you the instructions
Respectfully I work full time and can not take time out of my work day to get to you that fast. I'd appreciate your patience in the matter and I'll get to you as soon as I can .
Like @hardy stream, I'm waitting to for this "factory". But need to be patient
Principally because we are buying. So we need to see with who is selling a good time
how?
Let me get it
alright thanks
https://docs.google.com/spreadsheets/d/1E6DIyz-frDK3eozDOFaZhO0VECENnLwuzKhvYMvWdTo/edit?usp=sharing
here @grizzled delta
have all the materials that you need to buy
The price of the service
if you want v1.2 or v2
the quantity of trailers that the "machine" will work
meow

if you want more help @grizzled delta , ask Silbersix
we know better about this, because he did that
found it?
no
click at "Archives"
how?
im not on pc i dont see that
try to click at "Player sheet"
alright
You have something similar to that?
yeah
Hmmmmm
this is what i see
like the top left?
see what have in Settings
I don't see why you have to get them into settings
go back and click at "Share"
that's the browser settings, not the sheet settings
I"m just seeing what have, the cellphone is different from mine
seems like a link share rather than the sheet being shared
because need to make a copy of the sheet
and I"m trying to find where niko can make that
niko has to download the app
google docs dont work?
yeah
that's... google sheets
google sheets has no functionality other than viewing mode when opened in mobile browsers to what I remember
do you have the app?
yeah
like, mine I opened with Google Docs
seems like it opened using google sheets or excel
judging from the sheet list under your screenshot
did you already downloaded this sheet @grizzled delta ?
yeah
if you downloaded, you can, with that, enter in the app
and open this dowloaded sheet
it doesn't show it
how did you manage to download the sheet file
here have "Download"
that just puts them into the "Downloads" screen
it won't download the sheet
that is the browser drop down menu, not google sheet
niko, try viewing in desktop mode
here have the "Drive". Would download there? (ik its to share, but.....)
what should i do?
yeah
are you logged in to your google account in your browser?
yeah
how about in the google sheets app?
hold up
i dont have a sheets app
only a app called docs
im assuming you mean that
that wouldn't work
oh
alright ill get it rq
alright i see the Oaklands thing in the app
alright
i figured it out
awesome
nope, the finished one just tells you how much it'll cost you
you can send a screenshot if you want to
its only with Silbersix
@cloud pilot can i buy one
well, you can sure buy one
but need to, first, get all the items listed bellow
and one thing
the "Aligment Conveyor Bug" isnt working more
so take out this
@grizzled delta
alright thanks
the only thing that I can say its will take a time to he build
because a lot of peoples are buying
for example, me
I"m at the final process of buying
I just need to find Silbersix into Oaklands
and give the rest of the money
and start seeing about the local
wow i missed a lot, thanks for the assist voided.
i just got back home so give me a chance to settle real quick and ill recap what i mised today lol
: )
basicly @grizzled delta want to buy the v2
with everthing
here
what you will need to pay to @cloud pilot is the service fee
the other part, materials, is what you will need to uy all the materials below
1545280
so,you will need, basicly, 1.6mil to buy only the materials
if you scroll down, you will see a list of these items
no thats for everything
oh
look the part about materials
about the cost of materials
would e 600k the total
and you would need to pay 950k for the service
truck and 2 trailers is good enough
you gotta worry aobut gettin g the materials on hand
and Silbersix, I need to enter in a server with you to give the service fee
the 1.4mil
and, about the blueprint part, I already have the material
im confused
gime 2 seconds
and ill cover what your previous messages were
im just updating the order queue real quick
alright
I"m just seeing in my mind a huge list of all the peoples 
@hardy stream i can get you the written guide now or anytime in like the next 5 hours if you are available
also @faint obsidian you wanted the v1.2 guide
current queue:
shard is kinda underway
ters needs to get back to me
scrab is an odd timezone
meat is an odd timeszone
well, I see that @faint obsidian is in another time zone. he said GMT+8
then its your void
oh
I thinked that this list would be larger, XD
he said he want it as soon as he want
because of the timezone
if I understand correctly
here is where he say
okay,can i get ur user to join or u wanna join me?
@clear crest , are you able?
yeah ill join on you
Beawise
finally, after 1 whole year, I'll be poor in oaklands
you dont have join on
give me a sec to get in a server and join on me
dino1dude
ill let you know when im in @hardy stream
k
Gave 1 Vouch to therealhomura (current: #1723 - 1)
@hardy stream 
@sand pebble yo
you said in dms but please document here just incase i need mod intervention, its just covering my butt
i got you im almost at 1.7 million shouldnt be too long till i reach it
okay bet
just lmk when you do and youll be added to the queue
@next valve you free?
kinda why?
this here @next valve
I think you bought something about the V1.2 or v2
what u mean? im cunfued ?
werent you buying a system from me
i have you on my doc
are you free i ahve time now to build one
i just didnt mark it on the sheet
my bad
lol
@south ginkgo

aight i guess @wind dragon if youre free
I'm free now
@cloud pilot
I'll just verify if my Roblox is allowing me to enter in a server
hey silber, apologies with what happened a while
I pro ably intervened in the middle of what you were doing
but I was in a rush so I had to make it quick
yeah no worries just check your dms
if it is lmk
I"m already in a server
public with few peoples
and yes, sometimes happen to Roblox simply not able me to enter in any game
received, thank you! will do later when I get home
💀
Yo I’m almost ready I just gotta get the stuff unless you can do that but I’m pretty much ready
Actually I’ll buy it
its called frequency im p sure
yo what is ur best design
for two trailers and a truck
and how much
for everything done
also
instead of the trailer and trucks being curled up can they be done in a linear fashion
because i need this to fit in a decently sized area
the curl is so that it is compact as possible, youre saying you want it in a straight line?
yeah
It’s 1.7 for the 3 trailer correct?
with only 2 trailers it might be possible, with 3 its definitely not
yes
Oka
the limitation is that alignment conveyors are only 24 studs long
so withthe design i want will it be 1.5m?
and also is this good with large loads
especially for flame slate
nothing is good with large loads, i limit the amount you can fill your truck with at a time. it can unload up to 250, but i restrict the loading to prevent spills
i run flameslate with it personally

Is it 250 per
do with that what you will
Ok
? its 700k mats 1m service fee
it takes 3 hours for me to build it for you and would otherwise not be worth my time with literally just farming intead
and as many can attest i provide great customer support after the fact
no idea what you mean but comeback when you have the money and we will add you to the queue 
How fulls the queue now?
Have a lot of peoples
Now, might have 8 to 10 peoples
Thanks is there an eta?
Unfortunately no. I work a lot (including weekends) plus I have school.
Understandable same for me do you have the updated queue log? @cloud pilot
got the stuff placed down, only things that are remaining are the storage drawers and the circuitry
Gave 1 Vouch to silbersix (current: #83 - 45)
at least school you dont have at weekends, so you are a bit more free
@cloud pilot do u think putting smelters and the other stuff for ores it would still work the same?
yea, would work
this "machine" can refine wood, stones and ores
oh ok
@cloud pilot It's great and works really well
and yeah I agree with the guide being a bit terrible, although I was able to just assume some parts and eyeballing it, there are times where the guide needs to be specific on certain stuff lol, especially for other people
but overall I got the final product working properly and that's all I want, thanks for the blueprint
Gave 1 Vouch to silbersix (current: #83 - 46)
Oh you used the old loader. Yeah that works too. If you want read the v2 guide I sent you and use the unloading mechanism from from that instead of the ice ramp
I'm glad you got it to work though that's turbo
For context- the v1 guide was written in a single night over the course of an hour while building for a client. The v2 guide was purposefully made with only the intention of doing the guide and over the course of like 3 days
I just thought it'd fit the v1.2 better and I kinda like how it looks more than if I used the v2 unloader
(although the way v2 unloader works is really awesome, watching the preview video on how it works was cool)
I chose v1.2 because I'd be able to add different modules
ah alright
v2 looked even more complicated so its be best to have it be clearer
Eh no diff. Personal preference
Just know that the v1.1 unloader can be greatly affected by server lag and you might have to manually unjam it
It's why I changed it in the later model
But it does have that classic feel to it y'know?
it's fine by me, as long as most of the stuff is being done in bulk properly, I'm fine with a one or a few jamming
At least is everthing working nice
To me, what matter is: is working or not?
it will only get better 🙏 i need that cutter dude
every single thing thats even slightly messed with my designs is all oversized objects
yea, this is normal to happen
when bigger is the project, more chance have to, one time, something wrong happen
i did my best with the v2 to basically go "you are not permitted to exist as an item cuz if you are an item you will cause problems- get in your crate"
basicly that XD
less lag, more cost
because of drawers

but at least, with that, we dont need to worry about laggy servers
it also reduces local load since conveyors are handled locally- mostly for mobile and console buyers :p
cant have item lag if you dont have items
yea
but this is for v2, right?
the v1.2 have some parts of it
Ye. V1 uses a conveyors based splitter on the top.
but not every thing about not having items
and @cloud pilot
I was verifying the items
and organizing them down the basement
and I see that 2 items dissapeared
idk how
probably falled when we was moving and I didnt see
but I already bougth them back
now its everthing organized, so will be better to build
so now I'm 100% sure that everthing is ready
this include the materials for the blueprint parts
and @cloud pilot , one more thing
I have a bunch of extra logic stuffs
so if you want to use them to, for example, test something to see if will be better. You are free to use it
Appreciate the offer but I have a stack of like 40 boxes on my own base of nearly every logic component lol
And good to know
I'll try to get an order done tonight 🙃 but no garuntee
I"m saying that because its better to you, because its in my base
as I said, waitting is somethign that I already learned
-# principally after playing a match of a game: needed 3 months to finish it
what would gives 80 million money... how in the world
@cloud pilot can u make me one how much does it cost
Well, have a local where you cna see the price and the materials to do
let me take this
https://docs.google.com/spreadsheets/d/1E6DIyz-frDK3eozDOFaZhO0VECENnLwuzKhvYMvWdTo/edit?usp=sharing
here
@thorn flax and @vocal bane
Need to download this and make a copy
so, with that, you can modify the doc and see how much would cost the v1/v1.2/v2
You guys working on any tn?
will show the cost of the service fee, the cost of the materials, and the total cost
wdym tn?
Just wondering what the queue is and who’s up next
well, have at least 8 to 10 peoples in the queue list
and I'm one of them
and take time to build this machine
busy chat
principally because isnt always that Silbersix is able
Okay just wondering what spot I’m in on the list
Its just explaining to new peoples here
well, abut this idk
would need to see with Silber
only he have the queue list
Okay
@cloud pilot , can you send the updated queue list?
and what did you ordered?
which version?
V2
Jeeesh does one work better than the other?
well, let me explain
the v1.2 is better to add more modules
if will have modules
like extra things
but its huge the machine
the v2 its much more compact
What works better less issues?
well, idk exactly which one
but probably the v2
Okay
because the v2 dont happen problems related to lag
Ah okay okay
well, not that much. When you select up the version and how much trailers you want
in the side, will show the price
and after choosing if you want to he build everthing, or other thing
after that selecting all, if you go down
you will see the list of all the materials that you need to have
Is there a blueprint for the build I’m trying to get it built as fast as possible
I’ll even pay more lol
you will need to buy them before starting building and paying the service fee
well, dotn have a blueprint
but, have otehr options that you cna choose
like, he can send a lsit of "how to build"
look at the docs
What doc?
this here
Okay
Yeah that seems complicated lol
How longs it take for you guys to build them?
well, its just Silber that build
the owner of this
unless you want to build by yourself
and idk how much time woudl need to build
would neeed to see better with the owner
when he is able
Okay i woudl definitely need a blueprint to build it lol
u can build it for me?
ok if he can build it for me can u tell him to dm or ping me
well, Silber is the owner of the "machines"
and of this post
;-;
so when he is able, he will see
ok
Please just buy the v2 
Maybe. Like I said I'm busy a lot and my worker is deadge
I'll send the updated queue when I'm back home
If get the v2
Void gave a lot of answers and some are half incorrect sorry y'all
Once I'm back home I'll take the time to come through better
@wind dragon ily but respectfully you don't know
ok, Ik that I dont know a lot of things. Principally because you are the creator of all this
but the v1 have a lot of problems (if you compare to other versions), because its a older version
I"m just trying to help. But at the end, I just not help
@cloud pilot can u build me ?
kinda yes and kinda no: it depends:
The v1 was designed to split materialy better and have the space to add new modules, sometimes struggles with particularly large materials and overall had a higher material cost.
the v2 was designed to be as small as possible, handle those large materials, while also being cheaper. the downside is the layout really
@cloud pilot yo
ye give me one second
ok
3 hours each, roughly
understandable
@cloud pilot can u build me v1 or v2?
yes i can build it for you. generally speaking
v1.2: costs 2.1 mill total with materials plus the service see
v2: costs 1.7mill with materials plus service fee. v2 is faster for me to build and also has a better DIY guide
which did you want
v2
then yes we offer a building service. totaly cost is 1.7 mill for you, you pay me 1m and the 700k is materials
test server video
cypo you looking for a job honestly
at this point i need an assembly guy 
updated queue
someone asked
@faint obsidian dm me if interested
@clear crest you avail for me to build your system?
can u do 1.5mil? for v2
ohh
nope
my prices are my prices for a reason
if you want to get it for cheap
gamble for it
I didn’t see my name on the queud list
theres a DIY for it
sorry i missed this part
basically a step by step guide where you do all the steps
way cheaper too
to me this sounds like you want the DIY option so you arent in the queue
Yeah if you’ve got the diy option I’ll do it
Probably take me longer to do but I don’t mind grinding the game
Is it like a blueprint or is it a video
@cloud pilot if your on right now I can hop on and pay you
plue print a 93 page document with step by step instructions
i can try to hop on
actually
give me
like an hour
if you can
Silber is planning something
aight im ready if you are
planning to play deadlock with friends lol
0_0
do you know when the conveyor filter update will come out?
no one know when this update will come out
ping me when ready
sadly no
sooner rather than later- they have the UI finished now
im on @cloud pilot
@cloud pilot I just ran a flame run and its my first time acually properly using it and its broken
keeps going into the same draw
let me get to rzr and then ill assist
seems to me like one of the circuits disconnected somehow
do i join you?
it says i dont have permision
dino1dude*
aww crap i joined meastwords private then
give me a sec
to join a pub
okay
yeah i might have missed something thats my b
im in
either that or it brokesomehow
konabikes53
alright send the 300k for the DIY package and ill give you the blueprint (give me perms to place it) and ill explain whats happening an send you the document
okay
Gave 1 Vouch to rzrerratic (current: #1735 - 1)
@sand pebble 
omw
bro turned it off. i turned it on again
❤️
can you take a look at this really quick when you get a chance i moved it into a different spot and i think the blueprint you placed above it looks different for some reason
i also had to move one of the cubes that goes around in the circle cause it didnt select on multiselect when i went to move it
sorry lol
XD
fixed this as well
the fix day
nah I'll pass on this one
hey @cloud pilot , during the weekend you are more free, compared to the other days in the week?
I just want to know how much the queue will progress
Nope. I either have work or school every day which is why I have a worker
I'm hoping he gets one or two done today
But we will see
oh
worker, who is?
Shojo. He's supposed to be handling @old sorrel order but hasn't started yet
@somber wasp was it you that was asking if I was looking for a worker?
Tbh I could use the help
hmmmm
I had someone reach out via DMS who's done the DIY package. If their work checks out after I inspect it hopefully I'll have someone that's able to assemble on my behalf
^
hmmmm
Silber
So 1.5m for two trailers right?
And i want it in the linear form
@cloud pilot
I'll double check for you but that sounds ballpark correct?
Seems like I should update my v1 doc lol
The 1.5m is the assembly fee
You could also diy it and pay 300k for a guide (that does still need a rework) but the materials are the materials
The v2 is also cheaper (1.7m TOTAL, 1M assembly 700k materials)
And if you rather test your luck to win the system for cheap: https://discord.com/channels/865737627712749579/1282450730057470093
@loud jackal
should i just wait to buy when the filter update comes?
im not gambling for a processor
ill just make one myself
im not paying m,ore then 2 million for that
my budget is 1.5m
I offer a DIY instruction book for 300k that goes step by step for making the v2 I offer. The v1 instructions are currently under redevelopment.
300k to me and then you supply the materials yourself. Should come in around a mill total if you have nothing
I would. Any filter system you're buying now will be obsolete once the update comes (and tbh it's looking like it's in next week's update so)
Oh ok
a mil total with the instructions?
Basically
I'm pocketing 300k and it's about 700k in materials if you have absolutely nothing- the bulk of the cost being storage drawers and the processing machines
but first if im buying i wanna see this in game in action
because this seems like a good deal
Check pins, video linked
but you did say there was an issue with the instructions
or it being outdated
and what do i do if i want it for 2 trailers in a linear line
I offer 2 models: the v1.2 and the v2. The v1.2 is the linear design and costs more from both a service fee and materials perspective. While the v2 is square and costs less, but also has the updated assembly guide
It probably can be if you alter the alignment conveoyrs
The big restriction is the length of alignment conveyors and I wanted to support up to 3 trailers
i just want 2
Unfortunately not without you paying me more lol
trailers
how much more
cant be too much cuz this is such a small portion of the build
I'll be home in a few hours and test to see if it's even possible to realign them because the limitation is that alignment conveyors only extend 24 studs.
If it is I'll let you know I guess
And we can go from there regarding effort to pricing
ok
ok thanks for the tips i will start grinding so i can buy next weekend
@cloud pilot how do i buy this i need it it looks so sick
i got 250 peices of flameslate in a box 
so, let me explain
in this doc here
https://docs.google.com/spreadsheets/d/1E6DIyz-frDK3eozDOFaZhO0VECENnLwuzKhvYMvWdTo/edit?usp=sharing
you can see the price of the v1.2 and v2
will show the price of the materials, the price of the service fee, and the total
And to who do i send the document to?
you dont send the document to no one
Sooo
And i just dm silber?
you need to make a copy
Yea ik
you can ping Silber here
saying about what you want
I want 3 trailers with only logic service @cloud pilot but tomorrow after school
can you send a photo of the doc with the options that you choosed?
Nrn
VROOM VROOM
Close but no cigar. I have an order queue the size of Texas at this point and if you are wanting to purchase I'm slapping you at the back of it
And for what version
V2
And I should really get rid of that logic only option
Actually since you're the first person to order it
Imma say no to the logic only option
Either buy it or do it yourself. Cba to do logic for something you did wrong and then you blame me
Can't blame you for trying
Man I don't have time to edit these docs though gg
Fair enough
I just cant figure out the logic for my life
Oh well
Ill just spend more cash
So same thing v2 full build
Ill tell you where when the time comes
i mean if you need cheap i have a DIY options where you follow a literally step by step guide- logic included and it is the cheaper option
okay okay i can get that to you tonight lol
Tonight?
thats you paying me and basically skipping the queue since youre doing it yourself
yeah its 300k, i need to drop off a blueprint for you and send the guide
Do i have to pay u rn?
do you have 300k?
i had 10 before i gambled 3m on 300 trailers and didnt get a rare 😄
Pain
350 actually but 
I mean all i have to do for now is to pay u and blueprint?
dino1dude i have joins on
Ill lyk
lol. I think woudl be better save money to buy some rare item (liek WMI item)
1:30am, lol. To me its, now, 7:50pm, or 19:50
do you think that when the filter update comes out you will have to redesign the machine a bit?
well, the parts that use Filter Converyor will 100% sure need a redesign
the system itself no. the filter conveyor nonsense yes
right now filter covneyors are terrible
to the point that i dont even sell my design
yo @cloud pilot i need help
yea, ik how is
with what
like, one time I used the filter to separate the stone from the oreable. But didnt worked
aight so
im on now testing your stuff
and heres the problem:
this blueprint is the length of an alignment conveyor
I see
i can kinda get away with changing it from a square
to a semi circle
maybe
but it just aint it
Can you make it straight with more or does it have to be a semi circle
and i could sell you the v1.2 design
however that guide is awful by all accounts
only the v2 one is updated
so
theres a cooldown on alignment conveoyrs and things get jammed the second they start traveling across a lone conveyor
i mean if youre okay with it like, not being as good as the intended design i guess just go for it
im telling you now though it will get clogged and those giga large trees and ores will give you problems
this is kinda the max it can get to but because you want your trailers to connect when you spawn them
even this isnt full practical
Ok then i guess the curled up design is fine
let me just test one last thing
Does it work in the basement as long as the collection is above ground
and ill get back to you before i sell
uh it can
we tested this together
just be sure to move the blueprint straight down
Alrighty
okay so
the diy: 93 page document step by step. to make it easy for people to not mess up it has a bunch of blueprints that are used to align the placement of like, every single component
so that way you dont mess with any alignments
Sweet
i just place one all in one blueprint on your plot, send you the doc, and youre normally good to go
putting it underground will need a slight modifcation and testing but ill tell you that through dms
Cuz i do have some of the required mats so it might be cheaper
Okay
300k goes to me as payment for the design blueprint etc. and then its about 700k in mats if you have nothing already
this is actually possible imo
if you like it more
closer to linear
the long alignment conveyors would be the ones with the storage drawers on the far end
aight ill have to modify the blueprint but honestly not by much
call it 50k extra for the mod work
what is the trailer count toggle? same with the rarity removal? @cloud pilot
because, as I see, for v2 only have for 3 trailers
both are WIP and not currently available
dw about them
oh ok
its far less compact
if i were to buy the machine and these become availible will u be able to add it on?
if i pay for the addon?
@cloud pilot
Ok sure
hmmm, but at leats its more compact tham v1.2
actually less
for the same number of trailers its far wider
@cloud pilot how would i place an order on the hybrid processor?
pinned google sheet, instructions top left
once you have the money id basically be able to add you to the queue
i hopefully just got an extra builder so
@lofty gulch
so now have 1 person who helps with the WIP and one who helps with the building

isnt?
ok thx
aight im rapidly remembering why i dont do this
this is scuffed as heck m8
and you want it to be above ground drop off. tbh i can assert that the logic works but i may have to just leave the alignment to you and give oyu a description of how i think it will best work out
i mean all underground is fine
just a ramp underground will work
wanna do this rn or
lmk
im available for a while
aight i think i kinda finalized it
alright
its guna be scuffed but ill break it down for you
ok
let me hop in a pub
im in a private rn 2 seconds
ready?
aight come to my plot
Gave 1 Vouch to verycoolboy (current: #1072 - 3)
@loud jackal
Gave 1 Vouch to silbersix (current: #80 - 48)
@cloud pilot I’m finished with mine seems to be working good need to ore run first
yeah use the pinned document in this cannel to see the material list
@cloud pilot btw when i put like one ore in so far it gets stuck after it is forged n stuff
but ill finish it first
and it it struggles with bulk ill let you know

with the alternate system yeah?
do your best to problem solve bro with your special case i cant be constantly on call
ok
i mean i adjusted it a lot
this way so that the resoureces would fall onto all the conveyors
but it still barely works at all
if it works it works
you might need to make it more of afunnel
and like
completely surround it with borderless conveyors
otherwise it has an open side yknow?
@cloud pilot how much would it be to have the person building it for me to buy all the materials but i pay for the materials for them?
i aint doin all that
im alreayd on limited time
oh
do i just buy everything on the list
ok then

