#tender shit

1 messages · Page 1 of 1 (latest)

austere garden
lofty gorge
#

9 to Metroline tho

candid saddle
# austere garden ya

The start and end dates for the above contracts are detailed in the following table:

Route
Contract Start Date
Contract End Date
9/N9
27th January 2024
26th January 2029

632
7th October 2023
6th October 2028

U9
30th December 2023
27th December 2030

oak rock
#

9 will get 16s LTs?

#

it would make sense as it's getting withdrawn october

spice wind
sacred hill
old plume
static axle
#

9??

old plume
#

They could either use 9/N9’s existing allocation or use their own off from 168

old plume
static axle
#

Metroline

old plume
#

RATP lost 9/N9

static axle
#

Weird

old plume
#

Indeed

static axle
#

But

#

Still using the same buses

old plume
sacred hill
old plume
#

What’s funny is that Abellio dashed ex-68 LTs to RATP which includes LT666

peak trellis
#

9 going to metroline is the weirdest shit i've seen on the tender

oak rock
#

16 is getting withdrawn october

#

and then the lts will have nowhere to go

#

except maybe 32 to replace them tehs ig

past terrace
oak rock
#

it probably will

vernal shoal
sacred hill
old plume
#

That’s why there’s loads of options lol

neat schooner
#

It’s pretty obvious it’ll keep its current LTs

pulsar slate
oak rock
#

16 is getting withdrawn and 332 is getting the lts

#

mb

vernal hinge
oak rock
#

16 yh

old plume
oak rock
#

yh but that doesnt really matter