Concept is using steam turbine output to cool 125C sulfur to solid
Steam: 2000kg or more in total, preheat to 115-125C before adding (can be done with 1kg/s of water passing through a pool with a tricked tepidizer)
Liquid in the bottom pool: 800kg/tile, boiling point >= 125C, SHC at least 1, preheat to 100-105C (can wait for it to be heated up by sulfur before adding steam)
Liquid on steam turbine: 100kg/tile, boiling point >= 100C, Thermal Conductivity >= 1
Radiant Pipes and Tempshift Plates: Thermal Conductivity >= 50, melting point >= 140C
Insulated Tiles: Thermal Conductivity <= 0.1 (Mafic Rock or Ceramic) below the steam turbine, Thermal Conductivity <= 0.1 OR Specific Heat Capacity <= 0.2 for other insulated tiles
Liquid Valve setting: left 2g/s (Ceramic) or 3g/s (Mafic), right 1000g/s
Left Liquid Reservoir setting: 2/1 (Ceramic) or 3/2 (Mafic)
Battery and Auto-Sweeper: Overheat Bonus >= 30C, i.e. Overheat Temperature >= 105C