#Building a dock
8 messages · Page 1 of 1 (latest)
the request is granted, but has to be delayed until a later date.
The budget of the MoI has been adjusted (upwards). The request has been reconsidered and was elevated to active effective immediately. The bounty is set to 5000 euro. Enjoy building!
Two requests (hence the increased bounty): please make sure to add three docking bays for water crafts of the size of wooden transport ships as well as a proper indication (i.e. start a road stubby) where a road leading to the dock should connect to.
ill need acces to the district and a massively increased district size
also im working on another project for the MOC so im not confident i can finish both within the deadline for W1
Don't worry about the MoC project for week 1; I can make other arrangements to ensure we meet the five sponsored builds quota.
start building and we'll arrange for the area at a later date. I will re-zone it anyways
work complete