#Kinki

1 messages · Page 1 of 1 (latest)

teal geyser
#

@peak cedar @magic cape @spice hinge - starting this up so we can coordinate our zone

magic cape
#

Ah ok, we got our own dm group as well

peak cedar
#

ello

#

@teal geyser hey, can you send a quick screenshot of our area? So I can draw a rough sketch for the shin and/or regular lines

teal geyser
#

this work? wanted to make sure you got @crimson thicket in to the north

teal geyser
peak cedar
#

or is it mine lol

teal geyser
#

Looks like this....

peak cedar
#

So it's a good situation

#

Okay going to draw these now

#

The previous image was also partly my idea too

teal geyser
peak cedar
stoic sigil
#

🕵️

peak cedar
#

I thought of another alternative with connection to the regular rail

#

Also, forgot to mention, terrain is really tricky on your side too

teal geyser
#

It’s super tricky. I am thinking we get a bit creative with the city on top of the hill. Maybe flatten it out a bit and rebuild it nice.

teal geyser
peak cedar
#

aren't shinks standard gauge?

#

or are you talking about just having an "express" train

teal geyser
peak cedar
teal geyser
peak cedar
#

And from osswix all the way to oume (?)

glacial comet
#

ooh i've been summoned - the one good thing about the mini-shinkansen is it doesn't need to hit the big shinkansen standards
and you can do cool things where you have like
1 track standard gauge (normal standard gauge) minishinkansen
1 track narrow gauge (normal train)

then a passing loop where it suddenly turns dual gauge to allow for passing

#

but thats my 2 cents and i'll be happy whatever happens (and even happier if a shinkansen (a nd even happier if a mini shinkansen) )

peak cedar
#

I don't know where a mini shink might be possible

teal geyser
teal geyser
peak cedar
# teal geyser Looks like this....

Really just a basic sketch, pointed lines are some I am unsure about or that are suggestions, I've also marked some places where the important stops could be located

#

Yes, I know the shink at Isesaki is really far into the (still future) suburbs, but it has railway service

glacial comet
#

whats red

peak cedar
#

possible shink

glacial comet
#

i agree

peak cedar
#

Actually, I might have an idea for a mini-shink

#

Magenta

#

I think It's suitable, not sure if a little long

peak cedar
#

other alternative can be this

#

Though this one would require lots of terraforming and tunnels

#

let me know your thoughts, @teal geyser

teal geyser
teal geyser
#

Putting this here too. I agree that this would be a great route as it will be a primary access point to the north of the island #1204088496755712000 message

teal geyser
# peak cedar other alternative can be this

I think this works well, the other 'pass' from kumamato is actually really steep so lets do this. Shinkansens from Isesaki can terminate at kanazawa while the shinkansens from through run from migazaki to kumamato.

teal geyser
#

Question, where does the actual shinkansen run to... as these mini-shinkansens we'll be doing are essentially branchlines that run at 130kmh.

peak cedar
peak cedar
#

I will certainly do that one

peak cedar
#

@teal geyser I've built the shink station at Isesaki by the way

unreal blaze
glacial comet
#

If they are run in the shared blue company as all the other main shinkansen then it won’t be hard to slot it into a main timetable and run it from somewhere crazy like Nara even

teal geyser
#

Got it, so here’s what I think I’d like to do. I would like to run a mini-Shinkansen single track standard gauge, parallel to the DC tracks, narrow gauge, between isesaki and Kanazawa. It will connect to the bigger high speed network for through running but won’t be a high speed section.

Something like this… https://en.wikipedia.org/wiki/Ōu_Main_Line#Ōmagari–Akita_(51.7_km)

The Ōu Main Line (奥羽本線, Ōu-honsen) is a railway line in Japan, operated by the East Japan Railway Company (JR East). It connects Fukushima Station through Akita Station to Aomori Station. Since the opening of the Yamagata Shinkansen on July 1, 1992, the Fukushima–Yamagata section (as well as the Yamagata–Shinjō section since 1999)...

glacial comet
#

continue as you were

peak cedar
teal geyser
peak cedar
hazy shadow
teal geyser
teal geyser
hazy shadow
hazy shadow
#

I’d help more but I’m away, been enjoying the old buses at a show

teal geyser
hazy shadow
teal geyser
magic cape
#

I've done the main rail on my side

#

Expect for a lot of things like station and signalling

hazy shadow
peak cedar
#

@teal geyser This afternoon I will be off on holdays for a week

teal geyser
#

Enjoy! Maybe DM me your pw just in case.

peak cedar
teal geyser
#

Sounds good, if you’re sharing then no worries, you got cover

peak cedar
hazy shadow
# teal geyser I will have to, I have no idea what I am building!

While I always say that if you're doing a mini-shinkansen, the prime choice should be to isolate a section and convert to standard gauge and run standard gauge 719-5000 series or 701-5000 series EMUs on locals....the exception to that is this incredible (not very long) dual-gauge section of the Ou Mainline. You have the standard gauge on the left, narrow on the right - with the standard gauge staying single track for the most part and the narrow gauge expanding out to 2 tacks at most stations (like at 26:00). Here you get the standard gauge and narrow as dual-track for a section, effectively making a long loop for a mini-shinkansen. Meanwhile the narrow gauge continues to have 2-track looping stations as well through this section.... https://youtu.be/yP58a3weIzY?t=2376 then stations at 42:20 and 49:00 before it ends at 51:50. At 55:20 you'll see a standard gauge local on the left, here the shinkansens reverse and continue on a standard gauge only single track line to reach the Shinkansen route towards Tokyo. This train we're on continues down the Ou Mainline to Shinjo where it pulls into a split platform - because the other side of the buffers is a different mini-shinaknsen that's converted the Ou Mainline to Standard Gauge. 🤭

Anyway, I hope you find some inspiration from this fun 2-car local trundling along~

〇2021/05〇曇〇
経由; 東日本旅客鉄道奥羽本線
種別; 普通
運行/収録; 秋田ー新庄
車種; 701系
Via; East Japan Railway Ōu Line
Type; Local
Run./Rec.; Akita~Shinjō
Model; 701 Series

《停車駅; 着-発 Station; Arr.-Dep.》
四ツ小屋 Yotsugoya; 7:00-8:22
和田 Wada; 14:17-15:21
大張野 Ōbarino; 20:10-20:4...

▶ Play video
teal geyser
hazy shadow
peak cedar
#

@teal geyser Hey, I don't know what you've worked on, but if you want you can track up the station at Toyooka (I think it was called that?)

#

that and connect the track between toyooka and the rest of the shink

teal geyser
#

I’ll leave the decorating to the pros!

peak cedar
#

Make sure to add terminating tracks on my side for shink and Narrowgauge terminating tracks at both my and your side

#

I will ask epicpixel to connect the shink tunnel at Isesaki with Oume

#

If we get that we would be able to already run the shink from Oume to Isesaki

teal geyser
#

Good stuff! Im also set up at Kanazawa to receive mini-shinkansens

hazy shadow
#

Your train 52 is going on a very long lost joyride ;p

teal geyser
#

@peak cedar For your return, I made the routes through the valleys towards Isesaki... just needs connecting at your end!

#

Maybe some new towns added along the routes too!

#

@magic cape I am set up to run mini-shink from Miyazaki direction if you wanted to build a line. I was kind of hopimg you would as they can run all the way to Kumamoto.

glacial comet
#

👀

peak cedar
peak cedar
#

I will make a junction there yeah

#

Though I thought it may be a better idea if the ng tracks didn't go as parallel to the sg tracks as they are

#

since most towns would be on the middle area

magic cape
#

I dont really have hs plans

teal geyser
teal geyser
# peak cedar since most towns would be on the middle area

There is scope to push the lines out into the middle of the valley. In my head, this is rice field country so less urbanized, smaller towns, bus services. Also the single track line at renamitsu doesn't need to have a new junction, it can meet the 6 tracks further up. Your zone, so up to you but this is what I was thinking as I was building.

#

For context, the 'hs' lines are not really high speed. They are 130 kph lines to allow mini-shinkansens to branch off the high speed shinkansens lines and onto the mainlines. They are often a single standard gauge track that runs parallel to the existing narrow gauge line. That's the vibe I am suggesting for the lines from Kanazawa to Isesaki and Miyazaki... and beyond. (This... https://en.wikipedia.org/wiki/Ōu_Main_Line#Ōmagari–Akita_(51.7_km)).

The Ōu Main Line (奥羽本線, Ōu-honsen) is a railway line in Japan, operated by the East Japan Railway Company (JR East). It connects Fukushima Station through Akita Station to Aomori Station. Since the opening of the Yamagata Shinkansen on July 1, 1992, the Fukushima–Yamagata section (as well as the Yamagata–Shinjō section since 1999)...

teal geyser
# magic cape I dont really have hs plans

So with that in mind, it could be pretty straightforward to run a single track of standard gauge next to the line from tunnels at our border into Miyazaki and beyond? Could be a decent challenge!

peak cedar
peak cedar
teal geyser
magic cape
#

it doesn't make too much sense to have it loop around the mountains to come back there i think.

peak cedar
#

Most people would prefer to take the NG line from Isesaki to Musashino and transfer to Miyazaki instead of the shinkansen via Kanazawa, since it'd take longer

teal geyser
#

Fair enough, I'll temper my expectations on mini-shinkansens lol. It will just be the single line from Isesaki to Kanazawa.

peak cedar
#

Also how is the shink station at Toyooka made?

teal geyser
#

By the magic of dual guage. I'll grab a picture in a second, Openttd crashed on me.

peak cedar
#

Basing on how it is done I may have to modify Shin-isesaki slightly, since right now it only has one terminating platform and maybe it needs more (?)

#

and then just have two trough platforms instead of 4

#

or maybe Renamitsu can have a shinkansen station or a yard

teal geyser
#

Toyooka...

peak cedar
#

Interesting

teal geyser
peak cedar
#

Leave it as it is or do the 2-trough platform only idea

teal geyser
#

It depends what you are doing.... is this intended as a full shinkansen line from the NE? (if so you are using the wrong track... its only got a 160 limit)

peak cedar
#

Idea is full shink line from Oume, to Toyooka, and a mini shinkansen to your capital

teal geyser
#

How about terminate the Shinkansen at Isesaki instead, using your idea of 2 through, 4 terminating platforms.... mini-shink via Toyooka. it's too small for a full shinkansen and the terrain is very steep I had to reprofile the whole valley to make it look reasonable

peak cedar
#

Terminate at Isesaki and mini-shink to Toyooka and your capital

teal geyser
#

you got it. mini-shinks can run all the way to Oume!

peak cedar
#

I'm not adding extra tracks

teal geyser
#

miscount... 3 and 2

#

no new tracks needed

peak cedar
#

I am thinking of having double track until a Shinkansen yard at Renamitsu (or somewhere nearby), thoughts?

#

Maybe Shin-isesaki can still conserve a third trough platform, but only for terminating trains (so no trough running but allows terminating from both sides)

teal geyser
#

Renamitsu feels wrong

#

With some finessing and slight adjustments to the bridge, you could fit two sidings here. Depends how many you need overall I guess...

peak cedar
peak cedar
#

I like the two sidings idea there on the bridge, seems quite interesting

teal geyser
peak cedar
#

No no, they are NG tracks

teal geyser
peak cedar
#

I originally thought of that tunnel thing to put a road on

#

If you want you can put a buffer on the outermost track of Shin - Isesaki SG area

teal geyser
#

I won’t do too much. It’s your area for your return. I have a list as long as my arm for the Kanazawa area to do!

peak cedar
#

Yes yes, sorry if I am holding up Kanazawa

#

Don't worry, I will be back in Monday

teal geyser
#

No apology needed. We have lots of time. I’m away for some of this weekend so I won’t be here.

glacial comet
peak cedar
#

why shouldn't they

glacial comet
#

Someone will probably get on my back and say ‘oOh CaPaCiTy’

#

capacity my arse if we need more capacity then we reduce headways further

peak cedar
#

Line capacity is not a problem

#

Only if variable gauge trains existed in OpenTTD

unreal blaze
#

if only

#

well, couldnt that be coded like how multi-voltage trains are coded

peak cedar
#

Yeah that's true

#

But that would make specific trainsets work with specific tracksets only

teal geyser
cobalt lintel
#

im also part of this group btw

peak cedar
#

@teal geyser Heya hey as you probably saw I've finished the line to Toyooka, but no train running until I signal everything and place all stations

#

I've also built some highways

teal geyser
peak cedar
#

heyya, @teal geyser @glacial comet , I have done the SG signalling from isesaki tunnel to toyooka

#

you can now run shink and mini shink trains

#

make sure they are on the shared company

glacial comet
#

yep

peak cedar
#

Signals are programmed too

#

by the way, I have set up a dual gauge platform at Renamitsu for mini-shinkansen services to/from Kanazawa terminating at Shin-Isesaki platform 4 to stop there

#

rest of services should pass trough the sg-only track

glacial comet
#

are the signals programmed so that happens automatically

#

or are there any special orders i gotta do

peak cedar
#

waypoints

#

there are 3 or 4 waypoints

#

so the programmed signals work you know

glacial comet
#

gucci

peak cedar
#

I've set a 30km/h limit at the Shin-isesaki curve, not sure if It's too slow

teal geyser
#

Thanks for the setup!

glacial comet
#

yep

#

well guess i've got another mini shink to setup

#

hopefully this doesn't go kaboom like the isesaki one did

#

not isesaki

#

toyowhatever

#

chinchinshinshin

peak cedar
glacial comet
#

bad news

#

due to my stupidity Onara (and all other mini shinks for that matter) won't run half-hourly but instead slightly botched 2tph

#

24,36 interval

#

good luck :DDD

teal geyser
#

Is this related to the 2 minute turnaround in Kanazawa? Could you add one more train and have it sit there or have it go to a siding for the time it has to wait?

#

Talking of which, overnight storage can happen at Kanazawa too

glacial comet
#

this is due to it fitting into the rest of the shinkansen timetable

#

also uh

teal geyser
#

lol, yes we got to figure out where to have them pass each other

#

Or if they are infrequent we can prevent the lines being 2 way

glacial comet
#

also they're doing this in kanazawa

#

i think i forgor something

teal geyser
#

Perhaps the wp B_W

#

Throw that in before the Kanazawa order with a 0 tick travel time to Kanazawa

glacial comet
#

alr

#

for now i'm forcing all trains into that depot by removing the bypass track and set the yellow signal to reserve through

#

till you can sort something

teal geyser
#

Ok sounds good, is any thing leaping out to you as where they cross each other?

glacial comet
#

honestly i got a notification and clicked it and boom shaboom

#

haven't looked into it

teal geyser
#

Cool cool

glacial comet
#

im fixing 3 "jams" at once rn so uh not in a diagnostic mood

teal geyser
#

Totally understand

glacial comet
#

they do this here too

#

maybe some temp 1 way operation luca style would be fitting

#

or more simply just make allthe signals reserve through

teal geyser
#

If you are done with timing I can just take a look at times and plot some passing places

#

This looks like a good place to start haha

glacial comet
#

(When they decide to show up)

peak cedar
glacial comet
#

due to bad timetabling on my end the times hasve been shifted again :((

#

but now its permanent till 320kmh era

peak cedar
#

Hey hey! Sorry I haven't joined in a while now

#

I have been taking a general break from everything

#

I will resume tomorrow

cobalt lintel
#

really starting to come together