#Thread
1 messages · Page 1 of 1 (latest)
ty 🙂
im nerfing the power draw
cus 2gw alot
if you have separate tiers of belts, i would make each higher tier cost less electricity to attain the same speed
yeah but the point of it so u didnt HAVE to have tiers of belts
I suppose
but its not a bad idea
i would also make the cost exponential over speed
how about research
it is
2 gigawatts??
yeah 2 gws cus i had a few belts at 200 items per second
which seems high
Maybe add a maximum speed lol
200 IS the max
correction
it will
but ima nerf it
i didnt realize how much it takes
so im sayign like 100kws to 10kws for 10 items per second
How'd you overcome the standard issues from needing to swap between prototypes?
they didn't
Awesome! When release? :x
Just started a run with powered belt with the typical bugs and ups drain.

but at least it works with blueprints so i really dont care lol