#somethings wrong with credits system
1 messages · Page 1 of 1 (latest)
https://old.reddit.com/r/kiroIDE/comments/1sdcbc2/credit_usage_bug/
Could be related.
yes
So it wasnt just me or how i am doing things. A simple function change is costing around 10 credits.
Switch to opus4.5. I think is an issue with the model with 1M context. I’ve seen same reports in claude code
Doesnt AWS use claude models they host though? Not through Anthropic?
Good luck, they freakin suck