We had this running fine with ESXi 7 but out service team updated VMware to 8.0.3 and now whenever we try to deploy it bombs out and deleted the cluster.
The error is
Node “node1” create failed. Reason: Could not create CD-ROM:
SOAP Fault:
———————
Fault String: A specified parameter was not correct: spec.url
Fault detail: InvalidArgumentFault. Manual deletion of this node from its host maybe required
Any ideas ?
We are running Deploy 9.15.1