We are planning on an expansion of current 4 nodes SG. due to lack of enough switch ports, We are thinking a temporary solution, which is to unplug 2 x 10GB ports out of total of 4 ports in LACP group on the current SG nodes, and use 2 cables for new SG nodes. I am thinking we should stop I/O first before unplug.
- Does that make sense to you?
- What is the method to stop I/O first on each node one by one?