#[PASSED] IIP-47 lluvium Beyond Wave Duration Adjustment

1 messages · Page 1 of 1 (latest)

orchid eagle
#

<@&1107754780744487002> Snapshot: https://snapshot.org/#/community.ilv-gov.eth/proposal/0x7b41ef8bcbdae3cfcef6be8b6796d4df15ef1b2b69192b8de532550c27b7a9e0

Simple Summary:

Change the remaining Illuvium Beyond set 1 wave’s duration from three months to four months and have the gap period between waves be adjustable by the team. This will be best to sync Illuvium Beyond with Illuvium Overworld set 1 and increase the flexibility of the promotional partnerships.

Abstract:

Given the Open Beta launch has been delayed and Illuvium Beyond wave 3 is now on a stalemate regarding its release date, this proposal aims to better align the Illuvium Beyond timeline with Overworld set 1 and try to avoid a large period without any sales between illuvial sets. To achieve this we suggest changing the remaining set 1 wave interval from a fixed one month to a flexible period that’ll be adjustable by the team. This, paired with an Increase of the remaining set 1 wave’s duration from three to four months which was an idea that the majority of the community voted on a poll made in the Beyond discord will help time the promotional partnerships with an active wave running to prevent the problem that happened during wave 2.