TL-DR: Semi Hard Cap (2-3 weeks max) Subathon Timer.
I made this a bit ago, testing ideas for a Subathon timer, this was designed with the idea of having the Subathon end at around 2 to 3 weeks, based on sub count. It is a decently hard soft cap.
The way the soft cap was done here, is by reducing the time per sub, based on the amount of subs that have been given. So the more subs given the less effect they have.
Sheet Share Link: https://docs.google.com/spreadsheets/d/1vWemMZ_BLQC77fWmhX0BG727JoIieWtKOXh8k-RG-t8/edit?usp=sharing
About the sheet:
The google sheets is protected, and has some cells that can be edited, but it will be easier to just make a copy, as I had the formatting set up. The only cells that would need to be changed are total subs, and Time per sub.
(Picture of base idea below, the time was my example)
-# If needed I will remove/lock the 2 semi Editable sheets, but the swarm can behave I hope 
More info for the timer:
Initially I decreased time every 10k subs, then every 20k subs, once 100k was hit. My guess for total sub count was around 150k-200k subs, and 200k the Subathon would last almost 3 weeks (2.88).
For reference, the way I had it, from 200k to 300k subs, the total time would go from 2.88 weeks to 3.14 weeks.



soft cap