I'm at pg 118 in the LDO assembly manual. The first step is to place the end of the belt between the accent-colored piece and the idler assembly. This implies that the M3 & M5 bolts that go through the bearing block and the accent piece to secure the stack to the extrusion are loose enough to get the belt through. But this stack is resting on the carrier connector, so if the long M5 bolt though the connector and into the bearing block is in place, that won't work. Do you keep the bearing block screws loose, insert the belt, tighten the bearing block screws and then insert the long M5 to secure the carrier connector to the bearing block? Or am I totally off-base here? TIA
#Z Belt Routing, pg 118?
1 messages · Page 1 of 1 (latest)
Do you keep the bearing block screws loose, insert the belt, tighten the bearing block screws and then insert the long M5 to secure the carrier connector to the bearing block?
This is what you need to do, yes, i don't think it's well explained in the manual
thanks!
The 9mm Z belt comes as one 6m length. Is it safe to cut into 4ea 1.5m lengths for the 4 belts?