#Cargo depot
1 messages · Page 1 of 1 (latest)
Maybe they're really not connected yet.
In my case when laying the railroad (not the route), the green frames in the depots must be the start or end of the drawing in order to be connected.
1 messages · Page 1 of 1 (latest)
Why can't I connect between depots? They're close together, and the tracks are connected. Can anyone help me?
Maybe they're really not connected yet.
In my case when laying the railroad (not the route), the green frames in the depots must be the start or end of the drawing in order to be connected.