My take on drecko ranches using adult dreckos leaping behavior to move to the correct stable for repopulation. 1 drecko is kept in reserve as there may be droughts where not many normal dreckos are made.
- Critter fountain optional, and can be swapped with a grooming station and moved further to the right
- Shearing station and stable hydrogen top layer in the breeder stable is also optional and constitutes a very small percent of the plastic production
- Industrial stuff on the right can be anything - just meant to represent space that can be used
- Excess dreckos provides the necessary cooling for the aquatuner. Shearing room should have enough thermal mass to compensate (200 kg total of hydrogen or about 8kg/tile was ample enough buffer)
- Glossy dreckos can be used instead, which also means not needing a rail element sensor to filter for drecko eggs. You'll need 8 mealwood plants to compensate
- Use of only 2-tile high liquid locks makes this accessible to those who haven't mastered waterbending