hoary arrow
#

I have a Modpack with the quota rollover mod and when there is 0 days left and the quota is already met because of the behavior of this mod it instantly skips going to the company and set it to 3 days remaining.
Is that supposed to happen? Because it never happened to me before playing on v50.

jovial merlin
#

I have the same issue

hoary arrow
gray vessel
#

GeneralImprovements have the same function in its configs

analog zinc
analog zinc
#

Roll back Quotarollover to 2.3.0 and it fixes the issue @hoary arrow cc: @proud plume

proud plume
#

If anyone @here is will to test fixed versions, it would be much apreciated

#

I changed the way that time is checked so things should function normally again