When placing a mining camp near a copper vein for example, the mining camp ghost object looks like it will place fine, but when actually building it the building materials dropoff location deletes nearby vein.
- Placing structures should show the impact to placement in the ghost object outline, including the materials dropoff location.
- Objects which will be deleted due to building placement should be highlighted red to indicate they will be impacted by the structure.
- structure area should be outlined during ghost build phase so you can judge the range the structure has.